C.I.P. Homes – GENERAL HOME INCLUSIONS
- Detailed working drawings
- Council application fees
- Home Owners Warranty Insurance
- Construction within Adelaide metropolitan area
- Engineer’s report detailing site requirements
- Foundation package for ‘A’ class soil on clear and level site
- Concrete pump allowed for single pour
External |
Internal |
Cabinetry |
Sanitary/Tapware |
|||||
Appliances |
Tiling |
Electrical |
Services |
|||||
Painting |
NOTE: fencing, landscaping, carpet, living area floor coverings, window treatments, light fittings, heating/cooling, soft furnishings, retaining walls, rock digging, removal of fencing, recycled water requirements, solar hot water, site drainage or stormwater, individual encumbrance requirements – are not included in the price.
- Location of all survey pegs for land boundaries is the responsibility of the owner/s
- Cross-overs to the kerb and all-weather site access are the responsibility of the owner/s
- Removal of excess soil after siteworks and sewer is the responsibility of the owner/s
NOTE: Elevations are for illustration only and all dimensions are approximate. Prices and plans are subject to change without notice.
- Information is correct at time of printing E & O E
- All designs are Copyrite to C.I.P. Homes